Skip to content
Search

Buffalo Valley Rail Trail

#16 of 28 things to do in Danville Nature & Trails

About

The Buffalo Valley Rail Trail runs a flat 9.5 miles point to point between Lewisburg and Mifflinburg. Interpretive signs along the way explain the region's history.

The surface is paved asphalt at both ends and smooth gravel through the center. The trail was built on a 60-foot-wide abandoned rail corridor.

Suggested duration

2 to 4 hours

Good to know

  • The trail is described as good year round and wheelchair accessible.
  • Park at the Community Park in Mifflinburg; at the Lewisburg end there is parking near the Miller Center for Recreation and Wellness.

How we score it 4.1 out of 5, Touristchief score

How we rate places
  • 3/5 Things to do An hour or two of things to do
  • 2/5 Uniqueness A solid local pick
  • 3/5 Value Good value

Reviews

No reviews yet

  • Excellent 0 reviews
  • Very good 0 reviews
  • Average 0 reviews
  • Poor 0 reviews
  • Terrible 0 reviews

Been here? Tell other travelers what it was like.

Your rating (required)

Every review is read by a person before it appears. Owners and staff must say so in their review.

Explore nearby

Attractions

Montour Preserve

4.6 out of 5, Touristchief scoreWashingtonville · Half a day or more

Bloomsburg Fair

4.5 out of 5, Touristchief scoreBloomsburg · Half a day or more